Conveyor control and communication with PLCs

From PlcWiki

Revision as of 22:45, 11 December 2011 by Petr.zalabak (Talk | contribs)
(diff) ← Older revision | Current revision (diff) | Newer revision → (diff)
Jump to: navigation, search

CLEVER System communicates with three system within a whole assembly line. Ethernet communication (TCP/IP) is used for all of them. All three instances of plc_conveyor controller are running on CLEVER kernel server (plcgntnlkrnl).

Line Port Config file Note
Main line 6770 plc_conveyor_controller_main.cfg Main chain, stations Y1 and Y8
PAPA line 6771 plc_conveyor_controller_airbag.cfg Airbag pre-assembly
Shuttle line 6772 plc_conveyor_controller_shuttle.cfg Final sequencing of cockpits
Personal tools