CLEA Calendar manual

From PlcWiki

(Difference between revisions)
Jump to: navigation, search
(Created page with ''''Overview''' :The Clever Time Tracker (CTT) and Anton applications offers the option for visualization of production data and statistics based on the production. These figure…')
Line 8: Line 8:
As it can be seen from the above figure, CLEA calendar offers an analytical overview for the allocation of the human resources within a defined time period.
As it can be seen from the above figure, CLEA calendar offers an analytical overview for the allocation of the human resources within a defined time period.
More specifically, in the main part of the application window, under the “Line Shifts” sector, are displayed the days and the defined shift intervals.
More specifically, in the main part of the application window, under the “Line Shifts” sector, are displayed the days and the defined shift intervals.
 +
For each production day, a group of workers can be assigned under a specific shift interval.
For each production day, a group of workers can be assigned under a specific shift interval.
[[File:Screenshot_2020-09-16_10-31-14.png]]
[[File:Screenshot_2020-09-16_10-31-14.png]]
 +
Alternatively, a production day can also be defined but without assigning a specific group of workers on it.
Alternatively, a production day can also be defined but without assigning a specific group of workers on it.
-
[[File:]]
+
[[File:Screenshot_2020-09-16_10-35-08.png]]
 +
 
 +
On the right part of the screen, under the “Plan name” sector, are listed all the defined CLEA calendars.

Revision as of 08:40, 16 September 2020

Overview

The Clever Time Tracker (CTT) and Anton applications offers the option for visualization of production data and statistics based on the production.

These figures are created based on a defined Plan (CLEA calendar) which include information for the management of human resources (i.e. shifts, workers on each shift, shift breaks etc.) as well as production parameters ( i.e. target production, real production etc.)

File:Screenshot_2020-09-16_10-24-06.png

As it can be seen from the above figure, CLEA calendar offers an analytical overview for the allocation of the human resources within a defined time period. More specifically, in the main part of the application window, under the “Line Shifts” sector, are displayed the days and the defined shift intervals.


For each production day, a group of workers can be assigned under a specific shift interval.

File:Screenshot_2020-09-16_10-31-14.png


Alternatively, a production day can also be defined but without assigning a specific group of workers on it.

File:Screenshot_2020-09-16_10-35-08.png

On the right part of the screen, under the “Plan name” sector, are listed all the defined CLEA calendars.